top of page

Floorpan lined up

The floorpan is ready to be fitted with rivets. Here it is being clamped in position while we drill the holes in the chassis for the pop rivets.


Featured Posts
Recent Posts
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page